
15/25 Options Report
For Texas operators with wells that have been inactive 15 years or more and were completed 25 years or more ago. You get every affected well with RRC's cost calculation, what each of the four extension routes in RRC's proposed rule would require of you (in dollars wherever the rule gives a basis), and a draft schedule for the 2042 compliance plan, ready to file once the rule is final.
Senate Bill 1150 creates a new class of inactive well, the 15/25 well, with its own rules for plugging extensions. The Railroad Commission of Texas (RRC) proposed the rules on October 6, 2026 and held its public hearing on November 20. The rule is proposed, not final, and enforcement for 15/25 wells starts September 1, 2027. The report is built from RRC's own public records and its proposed rule.
Order the report
What is in the report
Your 15/25 wells as they will stand on September 1, 2027, each with the cost RRC calculates for it: RRC's per-foot plugging cost for the well's district times the depth on RRC records. The proposed rule also defines a full cost calculation that adds well-specific costs, such as well construction, access and brush clearing, H2S fields and RRC staff time. Those extras are not in any public file, so RRC's figure is a baseline and the full calculation can be higher.
Then the four extension routes in the proposed rule, each with what it would require of you: a compliance plan to September 1, 2042 (wells and dollars each year), an individual performance bond (shown at its face amount; ask a surety for the cost of the bond), financial hardship (the rule's own tests as a worksheet for your figures) and a history of restoring inactive wells (the proposed criteria). Extensions last one year and renew each year; the restoration and hardship extensions do not transfer to a new operator. Last, a draft schedule for the compliance plan.
Plan and filing
We can prepare and file the plan and the extension request with the RRC for you. Tell us about your wells and we will send a quote.